   |Mawkynrew       |Shri. M. N. Mukhim   |2000-  |   21   |1. Construction of C.C.footpath with |Rs. 1,00,000/-| 18,90,000/-  |Dev.35(III)20/2000/95     |Rs. 1,00,000/-|   100 %   |     Nil      |completed     |
   |                |                     |2001   |        |railing from Wahriat Madan to        |              |              |Dt. 24-1-02               |              |           |              |              |
   |                |                     |       |        |Nongjrong (Phase I)                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |2. Completion of school building for |Rs.   50,000/-|              |                          |              |           |              |              | 
   |                |                     |       |        |U.P. school Nongjrong.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Purchase of furniture for U.P.    |Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |school, Nongjrong.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Construction of R. C. culvert at  |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Wahdienglieng.                       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Construction of C. C. footpath    |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |from PWD Road to Mawmuthoh,          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Dienglieng.                          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Construction of drinking well at  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawmuthoh.                           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Construction of playground at     |Rs. 1,00,000/-|              |                          |Rs. 1,00,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |Dienglieng (Phase I)                 |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |8. Construction of C.C. footpath from|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |Unitarian Church to Unitarian Grave  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Yard Pingwait.                       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |9. Construction of C. C. footpath    |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |from PWD to Presbyterian Grave Yard  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Pingwait.                            |              |              |                          |              |           |              |              | 
   |                |                     |                |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |10.Construction of playground at     |Rs. 1,00,000/-|              |                          |Rs. 1,00,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |Pingwait. (Phase I)                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |11.Construction of drinking well at  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |Nonglynter, Kharang.                 |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |12.Construction of Bus waiting shed  |Rs.   30,000/-|              |                          |Rs.   15,000/-|    80 %   |      15,000/-|in progress   | 
   |                |                     |       |        |at Lad Wahshnong, Kharang.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |13.Construction of C.C. footpath from|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |PWD road to Khasi Grveyard Kharang.  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |14.Construction of C.C. footpath from|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |PWD road to R.C. Graveyard Kharang.  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |15.Construction of C.C. footpath from|Rs.   70,000/-|              |                          |Rs.   70,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |PWD road to Fellowship church,Kharang.              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |16.Construction of C.C. footpath from|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |PWD road to Umlangpung,Umsniang.     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |17.Construction if C.C. footpath from|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |Madan football to Mawshutwait,       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Umsniang.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |18.Construction of playground at     |Rs. 1,00,000/-|              |                          |Rs. 1,00,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |Umsniang.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |19.Purchase of 240 bundles C.G.I.    |Rs. 6,00,000/-|              |                          |Rs. 6,00,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |sheets to be distributed to the      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |poorest amongst the poors and fami-  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |lies affected by natural calamities  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |@ Rs. 2500/-per bundle.              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |20.Purchase of 30 Nos hand sprayers  |Rs.   60,000/-|              |                          |Rs.   60,000/-|   100 %   |      Nil     |completed     | 
   |                |                     |       |        |to be distributed to the deserving   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |farmers/units @Rs.2000/-each.        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |21.Construction of 15 Nos pig sty    |Rs. 2,25,000/-|              |                          |Rs. 2,25,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |for 15 Nos deserving farmers/units   |              |              |                          |              |           |              |              |
   |                |                     |       |        |@ Rs. 15,000/-per unit.              |              |              |                          |              |           |              |              |  
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |  
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |Shri. B. B. Lyngdoh  |2000-  |   7    |1. Construction of approach road from|Rs.   30,000/-| 1,80,000/-   |Dev.35(III)20/2000/56-A   |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |PWD road to Wahmawsiang Laitkyrhong. |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Extension of L.P. School          |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Laitkyrhong.                         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Construction of footpath at       |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Iewrynghep village.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Extension of playground for       |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawlyngot Sport Club, Mawlyngngot.   |              |              |                          |              |           |              |              | 
   |                |                     |                |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Construction of aoproach road from|Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawblang to Umlung at Mawblang       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |village.                             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Construction of footpath at       |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Ryngkya village.                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Construction of footbridge at     |Rs.   70,000/-|              |                          |Rs.   70,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Wahumwat, Khwad village.             |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |Pynursla        |Shri. B. B. Lyngdoh  |2000-  |  46    |1. Purchase of special ambulance for |Rs. 5,75,000/-|              |                          |Rs. 5,75,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |Lyngkyrdem Constituency Dev.         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Association, Pynursla.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Improvement of Community Hall at  |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Pomlum                               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Construction of Basketball court  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |by Mawkaiem School & Cultural Club   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Mawkaiem.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Football from Laitmassar to       |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Dymmiewmassar.                       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Construction of Bus shed at       |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Laitmassar.                          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Construction of Bus shed at Thang-|Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Kynta Maw-ah.                        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Completion of Mawkhap Community   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Hall.                                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |8. Completion of Presbyterian L.P.   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Mawkhap.                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |9. Construction of Mini Hall, Art &  |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Culture at Wahkhen.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |10.Fencing for Lawlyngdoh at Wahkhen |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |  
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |11.Completion of Club building by    |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Lyngkyrdem Cultural Club, Iewduh.    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |12.Construction of Lyngkyrdem        |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Presbyterian English School.         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |13.Improvement of playground of Sport|Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |& Cultural Club, Lyngkawet.          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |14.Repairing of L.P. School          |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Wahlyngkhat.                         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |15.Improvement of playground by      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |                |Wahlyngkhat Sports & Cultural Club.  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |16.Footpath at Shuthim village.      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |17.Improvement of playground at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Dewsaw Social & Cultural Club        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Nongblai.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |18.Providing of water supply at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mynring.                             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |19.Improvement of playground of      |Rs.   20,000/-|18,55,000/-   |Dev.35(III)20/2000/55-A   |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Social Welfare & Sport Organisation  |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |Mynring.                             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |20.Improvement of playground of      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Sport & Cultural Club,Laitmynring.   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |21.Construction of footpath near     |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |the residence of Smti.Pyrhoh to      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Lumkynthung, Pynursla.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |22.Construction of footpath at Lumkor|Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |23.Improvement of playground at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Lawei Musical Cultural Club,Pynursla.|              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |24.Providing furniture for Govt. L.P.|Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Pynursla Gate.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |25.Providing furniture for Seng-     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Longkmie Pyllun, Pynursla.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |26.Providing furniture for           |Rs.   60,000/-|              |                          |Rs.   60,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |St. Anthony's Higher Secondary School|              |              |                          |              |           |              |              | 
   |                |                     |       |        |Pynursla.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |27.Improvement of playground at      |Rs.   70,000/-|              |                          |Rs.   70,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Rangthylliang.                       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |28.Construction of School Building   |Rs.   80,000/-|              |                          |Rs.   80,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |of Raid Shabong Border Area Secondary|              |              |                          |              |           |              |              | 
   |                |                     |       |        |School (through the Managing Commit- |              |              |                          |              |           |              |              | 
   |                |                     |       |        |tee of the school).                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |29.Fencing of Pvt. L.P. School,      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Urksew - Wahpathaw.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |30.Construction of basket ball court |Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |of Synjuk Bhalang Urksew,Nongpathaw. |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |31.Improvement of playground of Sait |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |-bakon Sports Club & Social Welfare  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Saitbakon.                           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |31.Construction of Bus shed at Sait- |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |                |bakon by Saitbakon Sports Club &     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Social Welfare Saitbakon.            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |32.Construction of footpath at       |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Nongkwai.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |33.Providing furniture for Mawpran   |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Nonglyngdiang Community Hall.        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |34. Footbridge at Wahumshlei,Mawpran |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Nonglyngdiang(through R/S Mawpran,   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Nonglyngdiang.)                      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |35.Completion of Community Hall      |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |building at Mawpran Mawmadan.        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |36.Extension of Nongshyrngam L.P.    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |School building.                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |37.Footpath at Nongsder.             |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |38.Widening of playground for United |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Club Nongsder.                       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |39.Improvement of playground of      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |United Sports & Cultural Club,       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Lyting Lyngdoh.                      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |40.Improvement of playground at Nong |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Khliengbah Sports Youth and Welfare  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Organisation, Nongkhlieng.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |41.Construction of footpath at       |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Tyngkei.                             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |42.Improvement of playground of      |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Sports & Cultural Club, Madan        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Shadsngi Nongmadan.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |43.Construction of footpath from     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawmyllat to Jylliew at Myllat.      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |44.Improvement of playground of      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Sports & Cultural Club, Myllat.      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |45.Improvement of playground at      |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawmyllai Lyngngai Sports Club ,     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Lyngngai.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |Shri. K. K. Dkhar.   |2000-  |  48    |1. Improvement of Water supply at    |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |Pomshutia Village.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Construction of RCC water storage |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Tank at Nongthymmai(Mawshun)village. |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |                |3. Improvement of Spring Pond        |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |"Wahtongum" near Mawhun village.     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Extension of Street lights at     |Rs.  50,000/- |              |                          |Rs.  50,000/- |   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Nongshken village.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Maintenance of Nohwet proceeding  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |High School.                         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Maintenance of Mawriang L.P.School|Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Maintenance of Hat Thymmai L.P.   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |  
   |                |                     |       |        |School.                              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |8. Maintenance of Lunjingshai Upper  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Primary School, Umniuh Tmar.         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |9. Maintenance of Iarbamon L.P.School|Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |10.Maintenance of Lapalang Presbyte  |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |  
   |                |                     |       |        |-rian L.P. School.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |11.Maintenance of Pratlynti R.C.L.P. |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Nongshken.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |12.Maintenance of Church of God L.P. |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Nongshken.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |13.Maintenance of Sengkhasi School,  |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Nongthymmai (Rangnah)                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |14.Extension of Building of Nohwet   |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Sengkhasi L.P. School, Nohwet.       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |15.Maintenance including furniture   |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |for Riwai L.P. School,Riwai village. |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |16.Providing furniture for Nongtyngur|Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Presbyterian Upper Primary School.   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |17.Maintenance of Mawsohrisa L.P.    |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School.                              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |18.Maintenance of Pung Weikyan L.P.  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Weikyan village.             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |19.Maintenance of Mawbyrnei L.P.     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Mawbyrnei.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |20.Maintenance of Lumjingtip Upper   |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |  
   |                |                     |       |        |Primary School, Mawshun.             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |21.Maintenance of Pyrnai Presbyterian|Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |  
   |                |                     |       |        |Upper Primary School, Pyrnai.        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |22.Maintenance of Tiewlyngksiar RCLP |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |                |School, Nongjri.                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |23.Maintenance of Nongjri Govt. L.P. |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Nongjri Elaka.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |24.Repair & maintenance of Borma L.P.|Rs.   30,000/-|24,00,000/-   |Dev.35(III)20/2000/55-A   |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Borma Village.               |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |25.Maintenance of Nongsohphan L.P.   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |  
   |                |                     |       |        |School, Nongsohphan.                 |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |26.Maintenance of Nongthymmai        |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |(Mawshun) Presbyterian L.P. School.  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |27.Maintenance of Nongjri War L.P.   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School, Nongjri Ilaka.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |28.Maintenance of Mawdong Rev.J.J.M. |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Nichols Roy L.P. School, Mawdong.    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |29.Maintenance of Ringer Presbyterian|Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |L.P. School.                         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |30.Maintenance of Nonglyngur RCLP    |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |School.                              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |31.Maintenance of Cedar L.P. School  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Nongtyngur village.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |32.Purchase of one Hearse including  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |transportation charges for Wahkdait  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |village .                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |33.Improvement of a fishery pond     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |near Mawlyndun village.              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |34.Construction of a pond for bamboo |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |processing at Kerblang village.      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |35.Maintenance of Nongjri proceeding |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |High School.                         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |36.Barbed wire fencing at Horticul-  |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |ture farm at Wahdop near Umniuh      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Tmar village.                        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |37.Minor irrigation works for supply |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |of water to Pynnoh Umsong near Borma |              |              |                          |              |           |              |              | 
   |                |                     |       |        |village.                             |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |38.Improvement of a bath place at    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Sleitsaw area near Mawbah village.   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |39.Assistance to Shri.Moragi         |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Khongtiang a physical handicap person|              |              |                          |              |           |              |              | 
   |                |                     |       |        |of Shiliang Jashar village.          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |                |40.Repair and maintenance of a       |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Community Hall at Lyndem village.    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |41.Improvement of a drinking well at |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawlyndun village.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |42.Improvement of a Cattle Farm near |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Umniuh Tmar village.                 |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |43.Improvement of a Fishery at       |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Mawshun village.                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |44.Purchase of CGI sheets to be dis- |Rs. 7,65,000/-|              |                          |Rs. 7,65,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |tributed to poor families.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |45.Cost of transportation charges of |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |CGI sheets to Pynursla.              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |46.Financial Assistance to 22 farmers|Rs. 2,20,000/-|              |                          |Rs. 2,20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |for land re-clamation work           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |@Rs. 10,000/-each.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |47.Financial Assistance to 41 farmers|Rs. 2,05,000/-|              |                          |Rs. 2,05,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |purchase of a polythene pipes        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |@Rs. 5,000/-each.                    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |48.Construction of Passengers waiting|Rs. 1,25,000/-|              |                          |Rs. 1,25,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |sheds for 5 places @Rs. 25,000/-each |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
6. | Laitkroh       |Shri. B. B. Lyngdoh  |2000-  |  22    |1. Construction of footpath at       |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |Mawjrong village.                    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Construction of footpath from     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Sohsaron to Madan Football at Dieng- |              |              |                          |              |           |              |              | 
   |                |                     |       |        |kynthong, Laitkroh.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Construction of footpath at Nong- |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |thymmai, Laitkroh.                   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Extension of Maitphang Sengkynthei|Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |L.P. School Nongthymmai, Laitkroh.   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Repair of motorable road at       |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Kyrdemkhla, Laitkroh.                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Water supply at Umtyngngar village|Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Construction of playground at     |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Jalynteng Nongkynrih.                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |8. Construction of footpath from PWD |Rs.   20,000/-| 3,65,000/-   |Dev.35(III)20/2000/54-A   |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |road to Wahtyngngai Nongkynrih.      |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |9. Completion of Community Hall at   |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |                |Madan Lyngdoh  Nongkynrih.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |10.Construction of approach road from|Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Wahpein bridge to Wahpein Laitmawiong|              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |11.Footpath at Laitkynsew village    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |from Nongthymmai Umthli to Laitkynsew|              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |12.Construction of approach road from|Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Iewmawiong to Nongthymmai, Umthli.   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |13.Extension of Umthli M.E. School.  |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |14.Fencing of R.K. Mission School at |Rs.   25,000/-|              |                          |Rs.   25,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Umthli village.                      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |15.Construction of footpath from     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Wahsaitjain to Wahrit.               |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |16.Construction of footpath at       |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Laitmawroh village.                  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |17.Construction of footpath at Madan |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Phutblai, Nongkynrih.                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |18.Footpath from Madan Nan to        |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Lumthangding, Laitlyngkot.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |19.Completion of Govt. L. P. School  |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Laitlyngkot.                         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |20.Extension of Kyntiew Shaphrang    |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |High School, Laitlyngkot.            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |21.Completion of Community Hall at   |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Iew-Shillong, Laitlyngkot.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |22.Footpath from PWD road to         |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Lumjingtep Madan Lyngkhi,            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Laitlyngkot.                         |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
7. |Shella Bholaganj|Dr. Donkupar Roy     |2000-  |  10    |1. Construction of rural house for 42|Rs. 7,77,000/-|              |                          |Rs. 7,77,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |beneficiaries @ Rs.18,500/-each.     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Purchase of CGI sheets for 100    |Rs. 8,50,000/-|              |                          |Rs. 8,50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries @ Rs. 8,500/-each      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Construction of Bus shelter for 2 |Rs.   59,000/-|              |                          |Rs.   59,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |places @ Rs. 29,500/-each            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Extension of Electricity lines at |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Umwai village.                       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Renovation of Press Guest House at|Rs.   60,000/-|              |                          |Rs.   60,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Laitkynsew village.                  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |                |6. Purchase of tarpolin, chairs,     |Rs.   35,000/-| 19,95,000/-  |Dev.35(III)20/2000/53-A   |Rs.   35,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |utensils, etc. at Mustoh village.    |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Construction  of septic tank for  |Rs.   85,000/-|              |                          |Rs.   85,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |10 beneficiaries @ Rs. 500/-each.    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |8. Plantation of cash crops for 18   |Rs.   95,000/-|              |                          |Rs.   95,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneiciaries @ Rs. 5,000/-each.      |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |9. Purchase of T.W. Machine for      |Rs.   14,000/-|              |                          |Rs.   14,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Shri. L. R. Warbah, Sohbar.          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |10.Purchase of Sewing Machine for    |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Smti. Ranilinda Chyne, Mustoh.       |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
8. |Mawsynram       |Dr. Donkupar Roy     |2000-  |   7    |1. Plantation of cash crops for 19   |Rs.   95,000/-|              |                          |Rs.   95,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |beneficiaries @ Rs. 5000/-each at    |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Tyngnger.                            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Construction of  Community Latrine|Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |at Tyngnger Village.                 |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Plantation of trees for 6         |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries at Dewsaw   @Rs. 5000/-|              |              |                          |              |           |              |              | 
   |                |                     |       |        |each.                                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Plantation of betelleaf for 15    |Rs.   75,000/-|  4,05,000/-  |Dev.35(III)20/2000/60-A   |Rs.   75,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries of Lyngkhom @Rs.5000/- |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |each.                                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Plantation of cash crops for 10   |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries of Nongtrai @Rs.5000/- |              |              |                          |              |           |              |              | 
   |                |                     |       |        |each.                                |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Construction of rural house for 6 |Rs. 1,11,000/-|              |                          |Rs. 1,11,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries @Rs. 18,500/-each.     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Purchase of T.W. Machine for      |Rs.   14,000/-|              |                          |Rs.   14,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Smti. Magdalene Dkhar Nongtrai.      |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
9  |                |Shri. D. P. Iangjuh  |2000-  |  12    |1. Development of piggery for 65     |Rs. 2,60,000/-|              |                          |Rs. 2,60,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |2001   |        |beneficiaries @Rs. 4000/-each.       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Development of carpenter for 5    |Rs.  20,000/- | 24,00,000/-  |Dev.35(III)20/2000/60-A   |Rs.  20,000/- |   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries @Rs. 4000/-each.       |              |              |Dt. 28-6-01               |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. Handloom development to           |Rs.    4,000/-|              |                          |Rs.    4,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |Smti. Bharoli Hazarika Dangar.       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Poultry development for 11 bene-  |Rs.   44,000/-|              |                          |Rs.   44,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |ficiaries @ Rs. 4000/-each.          |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Goatery development for 10 bene-  |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |ficiaries @ Rs. 4000/-               |              |              |                          |              |           |              |              | 
   |                |                     |                |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Distribution of Sewing Machines   |Rs.   92,000/-|              |                          |Rs.   92,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |to 20 beneficiaries @Rs.4600/-each.  |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |7. Fishery development for 25        |Rs. 6,25,000/-|              |                          |Rs. 6,25,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries @Rs. 25,000/-each.     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |8. CGI sheets for 2 bundles to 230   |Rs.10,58,000/-|              |                          |Rs.10,58,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |beneficiaries @Rs. 4600/-each.       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |9. Distribution of modern musical    |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |instrument for Art & Musical Club,   |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Mawsynram.                           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |10.Construction/improvement of       |Rs. 2,00,000/-|              |                          |Rs. 2,00,000/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |College building for Mawsynram       |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Border Area College.                 |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |11.Financial Assistance of land re-  |Rs.    3,500/-|              |                          |Rs.    3,500/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |clamation for Smti.Bim, Dangar vill. |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |12.Financial Assistant of land re-   |Rs.    3,500/-|              |                          |Rs.    3,500/-|   100 %   |     Nil      |completed     | 
   |                |                     |       |        |clamation for Shri.Romen,            |              |              |                          |              |           |              |              | 
   |                |                     |       |        |Phlangwanbroi.                       |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
10 |                |Shri. B.B. Nongsiej  |2000-  |   4    |1. Extension of Weiloi Community     |Rs.  30,000/- |Rs. 90,000/-  |Dev.35/III/20/2000/121    |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |2001   |        | Hall.                               |              |              |dt. 11.4.2002.            |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2. Fencing of Pongkung Presbyterian  |Rs.  30,000/- |              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |compound                             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3. Repair of Church of God L.P School|Rs.  20,000/- |              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |building Mawhiang                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |4. Construction of passenger's shed/ |Rs.  10,000/- |              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |waiting shed at Mawbahrum Mawtyngor. |              |              |                          |              |           |              |              |
 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
11 |Mawryngkneng    |Shri S.S. Lyngdoh    |2000-  |   6    |1. Cooking utensils for 10 villages  |Rs. 1,00,000/-|Rs.24,00,000/-|Dev.35/III/20/2000/120    |Rs. 1,00,000/-|   100 %   |     Nil      |completed     |
   |                |Mawryngkneng C & RD  |2001   |        |Durbar @ Rs 10,000/- per village     |              |              |dt. 11.4.2002.            |              |           |              |              | 
   |                |Block                |       |        |durbar.                              |              |              |                          |              |           |              |              | 
   |                |                     |       |        |2. Purchase of carpentry sets to be  |Rs. 5,00,000/-|              |                          |Rs. 5,00,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |distributed to 200  nos of beneficia-|              |              |                          |              |           |              |              | 
   |                |                     |       |        |ries @ Rs.2,500/- per set.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |3. One multi-utility vehicles Toyoto |Rs. 5,60,000/-|              |                          |Rs. 5,60,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Qualis (Diesel for multi purpose     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |function in the constituency)        |              |              |                          |              |           |              |              | 
   |                |                     |       |        |4. Purchase of CGI shetts for 256 Nos|Rs. 6,40,000/-|              |                          |Rs. 6,40,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |beneficiaries @Rs. 2,500/- per bundle|              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |5. Purchase of agricultural sprayers |Rs. 5,40,000/-|              |                          |Rs. 5,40,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |for 300 nos of beneficiaries         |              |              |                          |              |           |              |              | 
   |                |                     |       |        |@ Rs. 1,800/- per sprayer.           |              |              |                          |              |           |              |              | 
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              | 
   |                |                     |       |        |6. Purchase of one Compaq Presario   |Rs.   60,000/-|              |                          |Rs.   60,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |P.C.                                 |              |              |                          |              |           |              |              | 
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
12 |Shella-Bholaganj|Dr. F. A. Khonglam   |2000-  |        |1) Construction of low cost building |Rs. 5,30,000/-|Rs. 5,30,000/-|Dev.35/III/20/2000/156    |Rs. 5,30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |2001   |        |for 265 Nos. beneficiaries @ Rs.2000 |              |              |dt. 24.10-02              |              |           |              |              |
   |                |                     |       |        |each                                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
13 |Khadarshnong-   |Dr. F.A Khonglam     |2000-  |        |1) Construction of low cost building |Rs.18,70,000/-|Rs.18,70,000/-|Dev.35/III/20/2000/157    |Rs.18,70,000/-|   100 %   |     Nil      |Completed     |
   |Laitkroh        |                     |2001   |        |for     Nos. beneficiaries @ Rs.2000 |              |              |dt. 24.10-02              |              |           |              |              |
   |                |                     |       |        |each                                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
14 |Mawsynram       |Shri B.B Nongsiej    |2000-  |        |1) Purchase of exercise book at the  |Rs.   62,000/-|Rs.   89,000/-|Dev.35/III/20/2000/178    |Rs.   62,000/-|   100 %   |     Nil      |Completed     |
   |                |                     |2001   |        |cost of Rs. 1000/- per family for    |              |              |dt. 5-12-02               |              |           |              |              |
   |                |                     |       |        |62 Nos of families (62 x 1000=62,000)|              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2) Purchase of Rs. 27,000/- selling  |Rs.   27,000/-|              |                          |Rs.   27,000/-|   100 %   |     Nil      |Completed     |
   |                |                     |       |        |items for 27 Nos. of Groceries at    |              |              |                          |              |           |              |              |
   |                |                     |       |        |the cost of Rs. 1000/- each          |              |              |                          |              |           |              |              |
   |                |                     |       |        |(27 x 1000 = 27,000 )                |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------